We were appointed by the owners of Riverside Park to be the exclusive decking supplier for the replacement of their existing deck board and handrails to their Clubhouse.
Extra consideration had to be taken due to the height of the decking area around 10m, resulting in added health and safety requirements. The existing joists had started to rot and needed to be replaced with galvanised steel. We were instructed to remove the existing handrails and deck board and replace with new.
More than 500 deck boards were removed and replaced and at the customer’s request, we managed to utilise the existing handrails to keep costs a minimum.